274_D
11/12
- Data Brochure
Boiler Control 274
1 of 44 © 2012 274_D - 11/12
The Boiler Control 274 operates up to four on/off boilers to provide outdoor reset operation, domestic hot water and setpoint
operation with priority. When operating as a tN4 System Control, the 274 can connect with up to 24 tN4 devices on a single
boiler bus. The 274 has primary pump sequencing capabilities along with a flow proof or combustion air damper proof
demand.
tN4 Compatible
24 Hour, 5-1-1, 7 Day Schedule
Flow or Combustion Air Proof
Four On/Off Boilers
Equal Run Time Rotation
Primary Pump Sequencing
DHW Operation
Optional DHW Sensor
Setpoint Operation
Additional functions include:
Input
Universal
Sensor
Included
Input
Universal
Sensor
Included
tN4
Boiler
Bus
Input
Outdoor Sensor
Included
OR
0-10 or 2-10 V (dc)
from EMS
Output
Up to 4
On/Off Boilers
Input
115 V (ac)
Power Supply
Input
Flow OR
C.A. Proof
Output
Up to 2
Boiler Pumps
Output
DHW Pump
OR
Primary Pump
Output
Combustion
Air Damper
OR Alert
OR
OR
Output
Primary
Pump
Input
DHW OR
Setpoint
Demand
Signal
Input
Boiler
Demand
Signal
Primary
DHW
1
13
24
VIEW
Demands
Setback
Boiler Control 274
One tN4, Four Stage Boiler & DHW / Setpoint
Menu Item
Test
Boiler Demand
DHW / Setpoint Demand
Proof Demand
EMS Input Signal
Priority Override
Power 115 V ±10% 60 Hz 7 VA, 1150 VA max.
Relays 230 V (ac) 5 A 1/3 hp
Demands 20 to 260 V (ac) 2 VA
Made in Canada by
tekmar Control Systems Ltd
tektra 1020-02
Meets Class B:
Canadian ICES
FCC Part 15
For maximum heat,
press and hold Test
button for 3 seconds.
not testing
testing
testing paused
off
red
red
Off
EMS
Rotate
Fixed Last
Pump Sequencer
Exercise
Off
Date Code
H2050A
Signal wiring must be rated at least 300 V.
DHW
23
/Setp
Com
24
Dem
Pr.
25
Dem
2513
+
46
BRet/
ComtN4
Boil
OutCom
Prim
P1 L N
20
Power
222187
Do not apply power
18
DHW
/ P2
17 191091211 1413 1615
Fixed Lead
First On / Last Off
First On / First Off
Relay
1
Relay
2
Relay
3
Relay
4
C.A. /
Alert
Boiler
Demand
Sup
DHW
Zone Load Shedding
1 Up to 4 On/Off Boilers
2 Up to 2 On/Off Boilers & 2 Pumps
3 Up to 2 Lo/Hi Boilers
4 1 Lo/Hi Boiler & 1 Pump
5 1 Three Stage Boiler & Pump
6 1 Four Stage Boiler
Modes
Vista de página 0
1 2 3 4 5 6 ... 43 44

Resumo do Conteúdo

Página 1 - - Data Brochure

274_D 11/12- Data BrochureBoiler Control 274 1 of 44 © 2012 274_D - 11/12The Boiler Control 274 operates up to four on/off boilers to provide o

Página 2 - User Interface

© 2012 274_D - 11/12 10 of 44 DHW Differential Setting in Adjust MenuDue to large differences between the heating load and the DHW load, a separa

Página 3 - Menu Item

11 of 44 © 2012 274_D - 11/12Mode 3 - DHW in Primary/Secondary with No PriorityWhen a valid DHW Demand is present, the DHW relay (termina

Página 4 - Sequence of Operation

© 2012 274_D - 11/12 12 of 44 DHW Priority Override Setting in Adjust MenuDHW Priority Override applies to DHW MODE 2 and 4, as well as Mode 5 if

Página 5

13 of 44 © 2012 274_D - 11/12Setpoint Operation Section FSetpoint operation is only available when DHW Mode is set to Off. The control c

Página 6 - Boiler Operation Section C

© 2012 274_D - 11/12 14 of 44 Mode 3 - Setpoint in Primary/Secondary with No PriorityWhenever a Setpoint Demand is present, the primary pump is t

Página 7

15 of 44 © 2012 274_D - 11/12Energy Management System (EMS) Section GThe control can accept an external DC signal from an Energy Management S

Página 8 - Burner On

© 2012 274_D - 11/12 16 of 44 Pump Operation Section HPrimary Pump OperationThe control includes two primary pump outputs with capability for se

Página 9

17 of 44 © 2012 274_D - 11/12Flow Proof Delay Setting in Adjust MenuThe control waits a period of time to receive a flow proof demand fro

Página 10 - Mode OFF / No DHW Generation

© 2012 274_D - 11/12 18 of 44 Setting the Schedule Section KTo provide greater energy savings, you can operate the control on a programmable sch

Página 11

19 of 44 © 2012 274_D - 11/12If the building is not up to temperature at the correct time, the BOOST setting should be lengthened and the

Página 12 - 70°F (21°C)

© 2012 274_D - 11/12 2 of 44 How to Use the Data BrochureTable of Contents This brochure is organized into three main sections.They are: 1) Sequ

Página 13 - Setpoint Operation Section F

© 2012 274_D - 11/12 20 of 44 InstallationStep One — Getting Ready CautionImproper installation and operation of this control could result in dam

Página 14

21 of 44 © 2012 274_D - 11/12Boiler Demand To generate a Boiler Demand, a voltage between 20 V (ac) and 260 V (ac) must be applied across

Página 15

© 2012 274_D - 11/12 22 of 44 Outdoor Sensor (tekmar 070)Connect the two wires from the Outdoor Sensor 070 to the Com and Out (2 and 3) terminals

Página 16 - Pump Operation Section H

23 of 44 © 2012 274_D - 11/12Wiring the Boiler Pumps (RELAY TYPE = Boiler pump )Terminals 7-8, 9-10, 11-12 and 13-14 are dry contacts. No powe

Página 17 - Time Clock Section J

© 2012 274_D - 11/12 24 of 44 Testing tekmar Sensors Terminals 2 – 6 To test the sensors, the actual temperature at each sensor location must be

Página 18 - Boost Section L

25 of 44 © 2012 274_D - 11/12Testing the Demands Terminals 21 – 25 1. Remove the front and bottom cover from the control.2. Use an electrica

Página 19 - 4 Communication Section M

© 2012 274_D - 11/12 26 of 44 Rotate / OffUse the Rotate / Off DIP switch to enable the Equal Run Time Rotation feature. This feature Changes the

Página 20 - Installation

27 of 44 © 2012 274_D - 11/12Display MenusView Menu (1 of 2) Item Field RangeAccessDescriptionVIEW-76 to 149°F(-60.0 to 65.0°C)USERINSTADVOUTD

Página 21 - Terminals 1 - 6

© 2012 274_D - 11/12 28 of 44 Item Field RangeAccessDescriptionVIEW2hr0 to 9999 hoursADVBOILER 2 RUNNING TIME SECTION C The total running time of

Página 22 - Terminals 7 – 22

29 of 44 © 2012 274_D - 11/12Item Field Range Access Description Actual SettingADJUST1 (4 On/Off)2 (2 On/Off & Pumps)3 (2 Lo/Hi)4 (Lo/Hi &

Página 23 - Terminals 2 – 3

3 of 44 © 2012 274_D - 11/12DisplayPRIMARY PUMPDisplays when primary pump 1 or primary pump 2 is in operation BOILERDisplays which boiler stag

Página 24 - Terminals 19 – 20

© 2012 274_D - 11/12 30 of 44 Item Field Range Access Description Actual SettingADJUST 3CP1, Au (Auto), OFFDefault = AuINSTADVBOILER 2 SECTION C

Página 25 - Control Settings

31 of 44 © 2012 274_D - 11/12Item Field Range Access Description Actual SettingADJUSTAu (Auto), 2 to 42°F (Au, 1 to 23.5°C) Default = AuADVBOI

Página 26

© 2012 274_D - 11/12 32 of 44 Item Field Range Access Description Actual SettingADJUSTLo, Med, HiDefault = MedINSTADVBOILER 1 MASS SECTION CThe t

Página 27 - VIEW MENU

33 of 44 © 2012 274_D - 11/12Item Field Range Access Description Actual SettingADJUST1 to 42°F (0.5 to 23.5°C) Default = 6°F (3.0°C)ADVDHW DIF

Página 28

© 2012 274_D - 11/12 34 of 44 Item Field Range Access Description Actual SettingADJUSTOFF, OnDefault = OnADVZONE LOAD SHEDDING SECTION MSelects w

Página 29 - ADJUST MENU

35 of 44 © 2012 274_D - 11/12TIME MENUItem Field RangeAccessDescriptionTIMEAMDefault = MONDAY12:00 AMUSERINSTADVCURRENT TIME AND DAY SE

Página 30

© 2012 274_D - 11/12 36 of 44 Item Field RangeAccessDescriptionTIME2000 ... 2255Default = 2005INSTADVYEAR SECTION JSet the current year.Note: T

Página 31

37 of 44 © 2012 274_D - 11/12Item Field RangeAccessDescriptionSCHDAMWake UnOccSleep– –:– – to 11:50 PMor– –:– – to 23:50USERINSTADVALL DAYS OF

Página 32

© 2012 274_D - 11/12 38 of 44 Item Field RangeAccessDescriptionSCHDAMWake UnOccSleep– –:– – to 11:50 PMor– –:– – to 23:50USERINSTADVMONDAY SECTIO

Página 33

39 of 44 © 2012 274_D - 11/12Item Field RangeAccessDescriptionMISCUSER,INST, ADVDefault = INSTUSERINSTADVACCESS LEVEL PAGE 4The access le

Página 34

© 2012 274_D - 11/12 4 of 44 Once the control receives a boiler demand it calculates a target water temperature based on the characterized heatin

Página 35 - TIME MENU

© 2012 274_D - 11/12 40 of 44 Testing the ControlTe stPress and Hold for 1 secondThe control has a built-in test routine that tests the main cont

Página 36 - SCHEDULE MENU

41 of 44 © 2012 274_D - 11/12To Enable Zone Test:1. Press and hold the Test button for more than 6 seconds. The control displays ZONE TEST O

Página 37

© 2012 274_D - 11/12 42 of 44 Error Message DescriptionVIEWSCHEDULE MASTER ERRORMore than one tN4 device has been assigned the same master number

Página 38

43 of 44 © 2012 274_D - 11/12Error Messages (3 of 3) Error Message DescriptionVIEWPRIMARY PUMP P1 & P2 FAILUREBoth the primary pump P1 and

Página 39 - MISC MENU

Product design, software and literature are Copyright ©2012 by tekmar Control Systems Ltd., A Watts Water Technologies Company44 of 44All specificatio

Página 40 - Testing the Control

5 of 44 © 2012 274_D - 11/12Terminal Unit Setting in Adjust MenuSelect the appropriate terminal unit in the adjust menu. This will change the

Página 41 - Error Messages (1 of 3)

© 2012 274_D - 11/12 6 of 44 Outdoor Design Setting in Adjust Menu The outdoor design temperature is typically the coldest outdoor air temperatu

Página 42 - Error Messages (2 of 3)

7 of 44 © 2012 274_D - 11/12Boiler Minimum Setting in Adjust MenuThe boiler minimum is the lowest temperature that the control is allowed to u

Página 43 - Error Messages (3 of 3)

© 2012 274_D - 11/12 8 of 44 Relay Setting in Adjust Menu (C.A. Damper / Alert)The control includes an auxiliary relay that can be used either fo

Página 44 - Technical Data

9 of 44 © 2012 274_D - 11/12Domestic Hot Water Operation Section EDHW operation is only available when the Pump Sequencer DIP Switch is set t